Project · Deep renovation

A 1965 house renovated to Passive House level in Limburg, Netherlands

A detached house of about 160 m², built around 1965, went from energy label F and about 3,000 m³ of gas a year to a heating demand of about 10 kWh/(m²·a), calculated in PHPP. It now produces more energy than it uses.

Building
Detached house, c. 1965
Heated area
c. 160 m²
Location
Limburg, Netherlands
Role
PHPP, HVAC, site checks, build

Results

Before and after

Annual figures, rounded.

Before and after
MeasureBeforeAfter
Energy labelFA+ (the best Dutch label at the time)
Energy for heatingc. 3,000 m³ gas/year (c. 26,000 kWh)c. 1,300 kWh/year for heating and cooling
Heating demand (PHPP)—c. 10 kWh/(m²·a)
Energy produced / used—12,000 / 6,500 kWh/year

Gas converted at about 8.8 kWh/m³. For comparison: the Passive House standard allows at most 15 kWh/(m²·a) for new buildings, and EnerPHit (the retrofit standard) at most 25 kWh/(m²·a) in a cool-temperate climate.

Works

What was done

The house was treated as a whole: the envelope first, then the building services, sized for the new, much lower demand.

  • Insulation of the walls, roof and floor.
  • New high-performance windows.
  • Mechanical ventilation with heat recovery and dehumidification.
  • Fresh air drawn through an earth-to-air heat exchanger, which pre-warms it in winter and cools it in summer.
  • A heat pump for heating and cooling.
  • Solar panels producing about 12,000 kWh a year.

Role

What Dezideriu Florian Pana did

  1. 1

    PHPP energy model

    The energy balance of the house and the choice of insulation, windows and systems, down to about 10 kWh/(m²·a).

  2. 2

    HVAC design

    Heat-recovery ventilation with dehumidification, the earth-to-air heat exchanger and the heat pump, sized on the calculated demand.

  3. 3

    Site checks

    The details that decide the result: continuous insulation, airtightness, and how the windows and ducts are fitted.

  4. 4

    Build and project lead

    Builder and project lead, from the start of works to handover.

For Romania

What this means for a house in Romania

  • Houses from the 1960s to the 1980s have the same problems as this one: uninsulated walls, thermal bridges, poor windows and air leaking in where it should not.
  • The right order (envelope, airtightness, ventilation, then the heat source) allows a small heat pump and very low bills.
  • A PHPP calculation before the works shows what each measure brings, so you do not pay for what never shows up on the bill.